Description:
A process that depicts how a building's performance compares to the specified design. This includes how the mechanical system will run and how much energy a building will use. Other aspects of this analysis include, but are not limited to, ventilated facade studies, daylighting and electrical lighting, internal and external CFD airflow, occupant evacuation, solar analysis, etc. As technology advances, builndgs are taking a 3D shape and project teams are using virtual environments to produce a climate. This in turn assists the design process. ensuring that the project is not overdesigned, which occurs additional costs.
Potential Benefits:
Creating a "what if" scenario
Ability to change different materials throughout the building to show better or worse performance conditions, without touching the building
Cut down on time needed for calculations
Can see how your building will affect the environment before it is built
Change aspects of your building instantly to help with LEED certification ideas
Can choose a different methods or aspects of construction to a building if the location, climate, and site don't cope well with your initial building ideas
Buildings can instantly be changed in software to check for better operation
Less over designing of mechanical system (Design phase)
Levels of Detail Considerations:
There will have to be much detail on the model for the analysis to be accurate. Materials, color, size, and aspects of the building must be entered into software to create the most exact model for it to be put into the virtual environment. All of these, but not limited to, aspects and more can contribute to how a building operates.
If the plans are just schematics, the mechanical engineer doesn't need to be involved
If detail needs to show capacities or design air flows, the mechanical engineer should be involved
Mechanical Engineer must or needs to help design BIM
Mechanical Engineer must be a part of the model as early as possible
Team Competencies Required:
Mechanical Engineer:
Need someone that knows the building systems and designs
Need someone able to see what is and isn't performing well
Building Controls Person:
Someone able to manipulate the system controls
Be able to unplug certain components without hurting other aspects of the system
Be able to check set points
Set points are easy to change and make uncomfortable spaces
Building Operator:
Someone who knows the building system and what it does on a daily basis
Someone to get complaints from occupants
Someone to get energy bills
Has theories they aren't always correct
Energy bill is good information to have for Building Performance Analysis
Training for Team:
Mechanical Engineer:
Must have experience with commissioning and/or mechanical design
can't be directly out of college
Must be able to do a Building Performance Analysis efficiently
Building Controls Person:
Controls are tricky
There are different interfaces and manufacturers
Must know the hardware itself
Must know the software to match the hardware to manipulate the system
Usually must learn directly from contractor, which can be difficult causing delays
Characteristics in order to substantiate BIM use:
Project -
Organization -
Environment -
Contract -
Process -
Potential Modeling Methods:
These models are best used for places that are occupied or are highly secured
BIM useful to see where ductwork is running
BIM useful to see where fuses are
BIM useful to see where reheating coils are located
Ect.
Best used for hospitals or mission critical facilities
These models are not completely necessary when a mechanical room is easily accessible, you can go in and see what's wrong yourself
In construction a mechanical lroom is most important to a model because of all the equipment
Potential Outputs:
3D Model which containing all building materials, colors, size, climate, etc.
Used to demonstrate how a building will perform
Legal / Commitment Considerations:
If the engineer running the program represents the owner, they will share everything with them with no legal faults
Additional Resources:
General Description:
Ayat E. Osman, Robert Ries. " Optimization For Cogeneration Systems in Buildings Based on Life Cycle Assessment" May 2006, http://itocn.org/2006/20/
Goal: Building Performance Analysis
Phase(s):
Operations (Starts in Design)Operation Objective:
[ _ ] Simplifying effort by using BIMs to calculate a buildings performance during a day or a life cycle[ _ ] Connecting a BIM to any virtual environment to see how the building will perform
Description:
A process that depicts how a building's performance compares to the specified design. This includes how the mechanical system will run and how much energy a building will use. Other aspects of this analysis include, but are not limited to, ventilated facade studies, daylighting and electrical lighting, internal and external CFD airflow, occupant evacuation, solar analysis, etc. As technology advances, builndgs are taking a 3D shape and project teams are using virtual environments to produce a climate. This in turn assists the design process. ensuring that the project is not overdesigned, which occurs additional costs.Potential Benefits:
Levels of Detail Considerations:
There will have to be much detail on the model for the analysis to be accurate. Materials, color, size, and aspects of the building must be entered into software to create the most exact model for it to be put into the virtual environment. All of these, but not limited to, aspects and more can contribute to how a building operates.Team Competencies Required:
Mechanical Engineer:- Need someone that knows the building systems and designs
- Need someone able to see what is and isn't performing well
Building Controls Person:- Someone able to manipulate the system controls
- Be able to unplug certain components without hurting other aspects of the system
- Be able to check set points
- Set points are easy to change and make uncomfortable spaces
Building Operator:- Someone who knows the building system and what it does on a daily basis
- Someone to get complaints from occupants
- Someone to get energy bills
- Has theories they aren't always correct
- Energy bill is good information to have for Building Performance Analysis
Training for Team:Mechanical Engineer:
- Must have experience with commissioning and/or mechanical design
- can't be directly out of college
- Must be able to do a Building Performance Analysis efficiently
Building Controls Person:Characteristics in order to substantiate BIM use:
Project -Organization -
Environment -
Contract -
Process -
Potential Modeling Methods:
These models are best used for places that are occupied or are highly secured- BIM useful to see where ductwork is running
- BIM useful to see where fuses are
- BIM useful to see where reheating coils are located
- Ect.
- Best used for hospitals or mission critical facilities
These models are not completely necessary when a mechanical room is easily accessible, you can go in and see what's wrong yourselfIn construction a mechanical lroom is most important to a model because of all the equipment
Potential Outputs:
3D Model which containing all building materials, colors, size, climate, etc.Legal / Commitment Considerations:
If the engineer running the program represents the owner, they will share everything with them with no legal faultsAdditional Resources:
General Description:
Software Applications: